Browse Items (5932 total)
Sort by:
NWC 129 â Dormaier, Jacob #043
Demolition of the Great Northern depot in 1972. Shows the Great Northern Hotel.
NWC 129 â Dormaier, Jacob #044
Great Northern clock tower with the empty space where the depot was.
NWC 129 â Dormaier, Jacob #057
Looking at Expo construction from the North. Can see the old Montgomery Ward's and Washington Water Power Company building in the background.
NWC 129 â Dormaier, Jacob #059
View of the industrial area around the Spokane River in downtown Spokane.
NWC 129 â Dormaier, Jacob #060
Shows construction around the Clock Tower with 315 days to go until opening of Expo.
NWC 129 â Dormaier, Jacob #061
Shows construction around the Clock Tower with 315 days to go until opening of Expo.
NWC 129 â Dormaier, Jacob #063
Construction with the clock tower in the background, from the Washington Stevens Couplet.
NWC 129 â Dormaier, Jacob #073b
Construction on the Spokane River for Expo. Shows the carrousel building.
NWC 129 â Dormaier, Jacob #074
Construction right around the clock tower showing 217 days until the opening of Expo.
NWC 129 â Dormaier, Jacob #077
Looking from the riverbank to the Washington Water Power Company building.
NWC 129 â Dormaier, Jacob #089
Spokane Falls with Washington Water Power Company building on the left.
NWC 129 â Dormaier, Jacob #097
Great Northern Railroad Depot, before the depot part was demolished. Tower shows 776 days until the opening of Expo.
NWC 129 â Dormaier, Jacob #099
Construction at Expo site, looking West along Spokane Falls Boulevard.
