Browse Items (50 total)

  • Collection: Grand Coulee Dam

GrandCouleeDam. NWC019.050

One map of the Columbia Basin Project.

GrandCouleeDam. NWC019.047

The Rising Structure. West bank portion of the Grand Coulee Dam.

GrandCouleeDam. NWC019.046

Below river. Drillers safe from surging waters behind a protecting cofferdam.

GrandCouleeDam. NWC019.045

Excavation below river level. Excavation activities in unwater riverbed section. March 1937.

GrandCouleeDam. NWC019.044

No description -- construction equipment

GrandCouleeDam. NWC019.043

Birdseye view looking south.

GrandCouleeDam. NWC019.042

"The Grand Coulee Dam, Power Plant and Pumping Plant"

GrandCouleeDam. NWC019.041

Typical powerhouse section - Grand Coulee Dam & Typical Spillway Section - Grand Coulee Dam.

GrandCouleeDam. NWC019.040

The Bucket. Downstream face of spillway with powerhouse foundation beyond.

GrandCouleeDam. NWC019.039

Cold Concrete. Nearly 2,000,000 cubic yards of it in west end of dam with Columbia diverted through low section.

GrandCouleeDam. NWC019.038

Columbia River Diverted. Two cross-river cofferdams divert stream through low sections in west portion of dam while east portion is unwatered for preparation of foundation.

GrandCouleeDam. NWC019.037

Source of supply for the eleven million yards of sand and gravel required for the Grand Coulee Dam.

GrandCouleeDam. NWC019.036

Gravel Pit. Deposit from which concrete aggregates are excavated by electric shovels and belt conveyors at a rate of 2500 tons per hour.

GrandCouleeDam. NWC019.035

Deepest foundation depression. Ice dam restraining the muck from flowing into pit.

GrandCouleeDam. NWC019.034

"Ice Dam" - Muck flowing into deep depression in bedrock, stopped by artificially frozen arch dam.

GrandCouleeDam. NWC019.033

Facilities for visitors. Some 200,000 visitors in 1936 inspected a model of the dam and from sheltered seats close to the work on each side of the river viewed the construction work and had it explained over a public address system.

GrandCouleeDam. NWC019.032

Cooling pipe. Water will be circulated through 2000 miles of it embedded in the dam to cool and shrink the concrete and thus facilitate grouting of construction joints.

GrandCouleeDam. NWC019.031

A "House of Magic" - One of two concrete mixing plants, capacity 8,000 cubic yards per day each.

GrandCouleeDam. NWC019.030

The checkerboard. The pouring of concrete into interlocking blocks permits grouting of contraction joints to form monolithic mass.

GrandCouleeDam. NWC019.029

West End Grand Coulee Dam - Concrete placing trestles and cranes.

GrandCouleeDam. NWC019.028

Upstream Face Grand Coulee Dam. 1,550,000 cubic yards of concrete in place.

GrandCouleeDam. NWC019.027

Jackhammer Men - with hard hats and safety belts they trim steep abutment slopes.

GrandCouleeDam. NWC019.026

Night at Grand Coulee.

GrandCouleeDam. NWC019.025

A five-yard shovel loading a twenty-yard "Buggy."

GrandCouleeDam. NWC019.024

Bedrock behind west cofferdam.

GrandCouleeDam. NWC019.023

Concrete placing - Dumping a four-yard concrete bucket.

GrandCouleeDam. NWC019.022

Concrete in dam. June, 1936. One millionth yard placed August 14, 1936.

GrandCouleeDam. NWC019.021

Concrete placing - January 1936. Top of dam 280 feet above high trestle deck.

GrandCouleeDam. NWC019.020

Governor Clarence D. Martin formally placing first concrete in dam, December 6, 1935.

GrandCouleeDam. NWC019.019

Conveyor stacker - discharging excavated material in Rattlesnake Canyon.

GrandCouleeDam. NWC019.018

Belt conveyor - Transporting excavated material to Rattlesnake Canyon, 1 1/2 miles distant.

GrandCouleeDam. NWC019.017

Excavation behind west cofferdam - August, 1935.

GrandCouleeDam. NWC019.016

Excavation - Five-yard shovel loading ten-yard buggies - excavating overburden from dam foundation.

GrandCouleeDam. NWC019.015

Driving steel piling. West cofferdam.

GrandCouleeDam. NWC019.014

West cofferdam, March 31, 1935. Length, 3000 feet, height 115 feet, over 17,000 tons steel piling, constructed in ninety days.

GrandCouleeDam. NWC019.013

Government camp and highway bridge, 1936. Upstream is west cofferdam, concrete placing trestle, and west conveyor.

GrandCouleeDam. NWC019.012

Builders' Quarters - Government camp in the foreground; contractor's camp across the river - 1936.

GrandCouleeDam. NWC019.011

The President's Visit - August 4, 1934.